Warning: mysqli_query(): (HY000/1021): Disk full (/tmp/#sql_ec2f4_0.MAI); waiting for someone to free some space... (errno: 28 "No space left on device") in /home/cyber-demo-client-website1.com/brmnew/wp-includes/class-wpdb.php on line 2353

Warning: mysqli_query(): (HY000/1021): Disk full (/tmp/#sql_ec2f4_0.MAI); waiting for someone to free some space... (errno: 28 "No space left on device") in /home/cyber-demo-client-website1.com/brmnew/wp-includes/class-wpdb.php on line 2353
Since 2016

BRM Utility Services

Your First Choice Contractor

Location

BRM Utility Services Ltd Moss Street off Sharp Lane Worsley M28 3LY

PIA Services

We have PIA accredited employees to carry out services that require this high standard.

Traffic Management Solutions

BRM have the in house capability to design and install their own traffic management.

High Voltage Electric Installations

BRM can offer duct installation, cable pulling and installation of all voltage cables.

4
Welcome to

BRM UTILITY SERVICES

BRM was founded in 2016 by Stephen Kealey who for over 20 years had been working in Senior Operational Roles within the construction industry, in this time he had seen how in the fast changing world of construction there was still a need for a traditional multi-disciplined contractor; that could deliver a first class service to diverse clients. In the first three years of business BRM have already made major strides into the utility sector undertaking varying roles on various schemes across the United Kingdom, see our case studies for further information. BRM have no intention of standing still and in 2020 aim to continue this growth and embedding our workforce into the BRM family. Our extensive knowledge of the sectors that we work in along with our desire to keep improving will drive BRM.
0 +

Years Of Experiences

Why Choose Us

WE PROVIDE QUALITY SERVICES

BRM are a professional company with a professional management team. We have a proven track record in the industry and have never failed to deliver a project to date.

Fibre

We supply a fully competent team with relevant experience to undertake the...

Power

We have undertaken horizontal directional drilling for duct installation...

Civils

Installation of haul roads with any specification that a client requires met...

Installation under ditches

We supply a fully competent team with relevant experience to undertake the...

Horizontal Directional Drilling

We have undertaken horizontal directional drilling for duct installation...

Installation of haul roads

Installation of haul roads with any specification that a client requires met...

Call Us

07704 778910

20 Years of Experience

Customer Satisfaction
98%
Project Delivery
95%
Exprience
98%
Sustainability
95%

Heading Here

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua Ut enim ad minim
Our Clients
BRM CASE STUDIES

PAST PROJECTS

Felixstowe – McNicholas (Kier)

Felixstowe – McNicholas (Kier)

Lorem ipsum dolor sit amet, consec adipiscing elit, sed do eiusmod tempor incididunt ut labore

The South – SSE

The South – SSE

Lorem ipsum dolor sit amet, consec adipiscing elit, sed do eiusmod tempor incididunt ut labore

London – Reach Active

London – Reach Active

Lorem ipsum dolor sit amet, consec adipiscing elit, sed do eiusmod tempor incididunt ut labore

East Anglia 1 Windfarm

East Anglia 1 Windfarm

Lorem ipsum dolor sit amet, consec adipiscing elit, sed do eiusmod tempor incididunt ut labore

1,450 Satisfied Clients Over The Globe

Poppie Person
    Poppie Person

    Entrepreneur

    Simon Rhodes
      Simon Rhodes

      Entrepreneur

      Miya Draper
        Miya Draper

        Entrepreneur

        Contact Us Now

        Do You Want Custom Project? Contact Us Now

        Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusm tempor incididunt ut labore et dolore magna aliqua
        What We Achived

        CHECK OUR HISTORY

        “At BRM we can offer SSE telecom – full turnkey service. We have In-house teams including – Civils, Pole erection, Fibre Cabling, UG/OH”

        2016

        BRM Founded

        BRM was founded by Stephen Kealey in 2016. We started works in East Anglia on the Flexistowe reinforcement project.

        2017 - 2018

        New Challenges

        Continuous working in the South East and the South including Fibre Installation, Feasibility studies and Route Planning Commenced work on the EA1 wind farm project. Part of a 12 month scheme to construct the largest offshore wind farm located in the North Sea.

        2019 - 2020

        Across the UK

        Alongside a HV Cable Installation in Central London BRM commenced works of on the Moray Firth offshore wind farm in the North of Scotland. Fibre installation contract in the West of the UK Supported the main contractor building a new substation as part of the wind farm project in Scotland. Commencement of the 21km project for SSE

        2021

        Current Year

        Achieved ISO 9001, 14001 & 45001 and Safe Contractor Accreditation Completed a full turnkey 21km project for SSE in Bournemouth


        Warning: mysqli_query(): (HY000/1021): Disk full (/tmp/#sql_ec2f4_0.MAI); waiting for someone to free some space... (errno: 28 "No space left on device") in /home/cyber-demo-client-website1.com/brmnew/wp-includes/class-wpdb.php on line 2353